Infrastructure and services to support investment

Saturday - 05/10/2019 23:24
cam lo
The highway from Cam Lo to La Son
Transport infrastructure
- The road system throughout the province is constantly being expanded and newly built, not only facilitating traffic and socio-economic development but also creating a refresh appearance of the province.
- The highway from Cam Lo (Quang Tri) to La Son (Thua Thien Hue) with 98km length and 23m width is under construction to facilitate goods circulation and economic development in the region. It is expected to complete in 2021.



 
phi cnh cng m thy qung tr
My Thuy deep-water port

Seaport
- Cua Viet port can handle transport services for loading ships up to 5,000 DWT.
- My Thuy deep-water port in the Southeastern Economic Zone (the nearest gateway to the East Sea on EWEC) has a design scale of 685 ha, including 10 harbors developed in 3 stages: Phase 1 (2018 - 2025) invested 4 stations with a capital of nearly VND 5,000 billion; Phase 2 (2026 - 2031) invested 3 stations; Phase 3 (2032 - 2036) invested 3 stations. The total cost is VND 14,234 billion, currently being constructed by My Thuy International Port Joint Stock Company.

Quang Tri Airport
Quang Tri Airport approved by the Prime Minister in Decision No. 236/QD-TTg is one of 28 domestic airports to be put into operation in the period of 2020-2030 with the scale of 4C-class civil aviation in 312ha which is built in Gio Quang commune, Gio Linh district, about 7 km from Dong Ha city. Currently, the Ministry of Transport is appraising the detailed design.

Technical - social infrastructure
- The system of post and telecommunications is developed with diversified and plentiful services and high quality, the networks of 3G, 4G and fiber optical cable network is covered the whole province. Quang Tri is implementing the construction of a public wireless (wifi) system in the central areas and tourist destinations across the province.
- Power supply system: Electricity for daily life and production is guaranteed from the national electricity grid through the 500 kV North-South line; national grid system is synchronous with 220kV and 110kV.
- Domestic water supply system is 55,000m3/day in capacity. In addition, the project "Water supply system for the Southeastern Economic Zone of Quang Tri" provided clean water and raw water with 50,000m3/day for each is currently implemented by the investor. The project aims to meet the water demand of not only daily life, but administration - public, production and services of the Southeast Economic Zone also.
- Health issue: The whole province has 63 health facilities with 2,025 beds and 2,564 manpower in total, including 575 doctors, 267 physicians, 718 nurses and 400 midwifes.

Support services for investment
Financial, banking and insurance services are increasingly developing to meet the business requirements. There are currently 17 bank branches in Quang Tri to meet domestic and foreign customers’ demand of transaction.